Home Solar Inspection
KEEP YOUR SOLAR PV SYSTEM RUNNING SMOOTHLY FOR YEARS WITH A PROFESSIONAL INSPECTION
Solar PV systems are an excellent investment for your home or business, but there’s no guarantee they will continue to run at peak performance levels for years without any maintenance. That’s why regular solar inspections by certified professionals like the ones at PEP solar is one of the best investments that you can make.
A Complete System Checkup
Our solar professionals will look over your entire system to ensure that it’s running properly. During a typical inspection, all the electrical connections will be verified, the inverters, disconnects, fuses, panels, and breakers will be examined as well. A total of 45 testing points is checked across the system to avoid skipping over any potential fail points or problems that could be building up. Our technicians understand NEC 690 code and can work with the controllers and computers to uncover any potential problems in the programming as well as in the physical connections and hardware of the setup.
Use Only Certified Professionals
Pep Solar only allows carefully trained professionals to visit homes and businesses and inspect the systems. Only certified professionals have the knowledge to decipher NEC 690 code and the experience to properly diagnose hardware issues in your system. You wouldn’t trust your health to an unlicensed doctor, so don’t trust your solar system to inexperienced or untrained technicians.
Protect your investment today and have a complete inspection done on your solar PV system. Call us for help today.
Breaking Down the Full Inspection
Below is a breakdown of everything that’s checked during a standard inspection. You can rest easy knowing that every major component of your system is functioning properly after one of these inspections.
- Equipment Approval
- Manufactures Instructions
- Site Drawing Review
- Electrical Diagram Review
- Array Mounting Information
- AC Module over current protection, disconnects and ground fault
- Stand Alone Inverter Output
- Maximum System Voltage
- 600 V Limit
- Maximum PV current
- Inverter Current
- Equipment Maximum Voltage
- Conduit
- PV Sour-Circuit Wiring
- PV Conductors Alone
- Ampacity
- Flexible Conductors
- Small Conductors
- PV Source-Circuit Conduit
- Connectors
- Wiring Connectors
- Junction Boxes
- Color Codes
- Strain Relief
- Multi-wire Branch Circuits
- Protected Circuits
- Multiple Power Sources
- Ratings
- Transformers
- Supplementary Over-current Protection
- Listed For DC
- Disconnects
- Array Disconnect
- Accessibility
- Marking
- Grouping
- Equipment Disconnects
- Fuses
- Features
- Ungrounded Systems
- Module Grounding Continuity
- Ground-Fault Protection
- PV System Grounding
- Single-Point
- Equipment Grounding
- Equipment Grounding Conductors
- Equipment Grounding Conductor Size
- Grounding electrode Systems
- Common Grounding
- Array Grounding
- Array Ground-Fault Protection
- Modules
- System Info At DC Disconnect
- Inverter Info At AC Disconnect
- Batteries – Extra Cost – Call for pricing
- Stand-Alone Systems
- Interactive Systems
- Single 120 V Supplies
- Ungrounded Systems
- Disconnect energized While Open
- Marking
- Back-Fed Breakers
- Inverters UL Listed
- Islanding
- Neutral Loading
- Unbalanced Interconnections
- Point of Connection
- Load-Side Connection 125% of Bus bar Rating
- GFCI
Batteries and Charge Control
This level of service is an extra cost – batteries and charge control not including any work repairs or parts to bring the system up to code in full operational order.
- General
- Voltage Limit for Dwellings
- Covers/Access
- Fuses
- Cases and Racks
- Series Disconnects
- Maintenance Disconnect
- Charge Control
- Diversion Charge Control
- Diversion Load
- Interactive Systems
- Battery Wiring
Let’s be Solar Hipsters Together
We have an American dream for real change by going green and helping to make the world a better place- and it starts with you and your community. Save money, protect our nation, and help our community thrive.